An offline-first inspection app for building surveyors that keeps working in basements and plant rooms, then syncs photos and reports as soon as a signal returns.

- Fieldnote
- 2025
- Next.js, IndexedDB, Laravel, S3
The challenge
Fieldnote's surveyors inspect fire doors, plant rooms and car parks, which are exactly the places where mobile signal disappears. Their previous tool was a web form that lost everything when the connection dropped, so most surveyors wrote notes on paper and typed them up in the evening. Reports reached clients days late and photos were often attached to the wrong item.
The goal was an app that works fully offline, captures photos against the right checklist item, and syncs reliably without the surveyor thinking about it. It had to run on the company's existing Android tablets and on personal phones.
The approach
Discovery
We joined two surveyors on site visits. The pattern was clear: they work through a building floor by floor, take many photos quickly, and only look at the report at the end of the day. The app needed to follow that rhythm instead of forcing a form-first workflow.
Design
Each inspection is a list of rooms, each room a short checklist, and each item can hold photos and a note. A small status badge shows what is saved locally and what has reached the server, so nobody has to wonder whether their work is safe.
Build
The app is a progressive web app built with Next.js. Every change is written to IndexedDB first and added to an outbox. A sync worker sends the outbox in order when a connection appears, uploads photos directly to storage with signed URLs, and retries with backoff. The Laravel API treats every change as idempotent, so a repeated upload never creates duplicates.
Results
- Reports now reach clients on the same day as the visit.
- Paper notes have disappeared from site visits entirely.
- Misfiled photos dropped to almost zero thanks to item-level capture.
What we learned
Offline-first is mostly about trust. The status badge, a clear log of what synced and when, and a manual retry button did more for adoption than any performance work. We also learned to test on cheap tablets early, because storage limits and battery savers behave very differently from a developer phone.
Working together
The Fieldnote project ran in short weekly cycles. Every Friday we shared a working build, a short written update and a list of open questions, so decisions never had to wait for the next meeting. Stakeholders could try each change on a preview link the same day, which kept feedback concrete and kept surprises out of the launch week.
The stack, Next.js, IndexedDB, Laravel and S3, was chosen for the team's existing skills and for long-term maintenance rather than novelty. After the 2025 launch we stayed on for a support period to fix issues, write documentation and hand the system over to the in-house team with a runbook that covers deploys, backups, monitoring and the most common support requests.